Installing an offshore large asset or an offshore wind farm includes the transport and installation (T&I) of many elements that will be connected to each other. Those steps imply the coordination of simultaneous operations (SimOps) on site.
Those SimOps are critical and can easily conduct the T&I to dangerous situations. To prevent this, the marine coordination with a high Q/HSE aspect is key.
We support all players involved in these critical phases to ensure onsite that the Q/HSE are fully understood and followed.